AI can turn approved project notes into briefs, supplier comparison drafts and lists of decisions awaiting approval. MaxiMind's AI ops team has a real person oversee the drafts, while your designers and site leads check facts and you approve commitments on your phone.
Human supervision covers the agreed work and hours in your plan.
Customers in Vietnam can choose MaxiMind-run operations (coming soon, with a separate data-processing agreement) or self-operation. For self-operation, MaxiMind installs, consults and trains in your own accounts; your team runs the tools, answers customers and keeps the data. MaxiMind does not hold your client data under this option.
Begin with project administration using documents your team supplies. We agree the draft workflow before setup. This does not assume AI can measure a room, inspect a site or update your design and project software directly.
What eats the owner's time?
A client chooses a different finish after the supplier quote arrives. The site team asks which drawing is current. A verbal request becomes extra work without a clear record of who agreed to it. The owner spends the evening rebuilding the story from scattered messages.
AI can prepare an organised account of what was requested, what is confirmed and what is waiting. Every draft should point back to a note or document. If a dimension or approval is absent, the task remains open rather than being filled in from context.
Which jobs can you give AI?
Turn meeting notes into a project brief
AI drafts a brief from notes your staff provide: room uses, preferences, stated budget and unresolved questions. The designer checks it against the conversation; you approve scope before staff share it. “Client prefers timber” stays a preference until someone confirms the material, finish and location.
Prepare supplier comparisons
AI organises supplied quotes into a working table showing materials, inclusions, exclusions and stated lead times. Your purchasing lead checks against the originals. You approve the selection and spending. A cheaper quote with missing installation details should be flagged for a question, rather than presented as the best option.
Draft a change-request record
AI prepares a record of the requested change, its source and the cost or schedule questions still unanswered. The designer and site lead check it; you and the authorised client representative approve commitments. AIA guidance on change orders stresses documentation and written client approval. Your own contract and adviser determine the required process.
Bring a project brief or change-request template to MaxiMind's AI operations team; we can discuss where a checked draft would help.
Assemble a site handover checklist
AI drafts a checklist from the drawing register and instructions your staff have approved. The site lead verifies the current revisions and technical details before anyone uses it. AI does not decide that work is safe or ready. A missing drawing reference is a question for the responsible designer, not permission to proceed.
Prepare client progress updates
AI drafts an update from verified site notes: work completed, decisions needed and items still being checked. The site lead confirms the facts; you approve dates and commercial promises. Your staff send it. Photographs can support the update, but AI must not describe concealed work as inspected merely because a room looks finished.
Summarise purchasing and open decisions
AI drafts an internal report from approved order records and the task board: material confirmations, unanswered supplier questions and requests awaiting your decision. A real MaxiMind supervisor checks the summary; you approve actions on your phone. Your purchasing staff place orders, and your accountant checks any draft cost schedule before it is treated as financial reporting.
What stays with designers and site professionals?
People measure, specify materials, coordinate trades and inspect work. Structural design, electrical safety and other regulated decisions belong to appropriately licensed professionals, who decide and sign. AI only prepares administrative drafts; it does not certify compliance or provide technical advice to clients.
Protect home addresses, access instructions, floor plans and photographs of private spaces. Share only the material needed for the agreed job, limit permissions and check retention with your own adviser. Client permission to photograph completed work should be checked separately from permission to use it in public content.
Website chat, phone answering and automatic message sending are coming soon. Today your staff talk to clients and suppliers, approve project actions and send messages.
How do we start?
- Day 1: A 60-minute session on your project stages, source documents, approval roles and a recurring paperwork task.
- Days 2–3: Set up the draft templates and task board around approved material. Agree how revisions and missing approvals are shown.
- Days 4–5: Trial on 100 real questions from project correspondence, removing unnecessary private details. Staff compare each draft with its source.
- Days 6–7: Review the first report on your phone: unresolved changes, source gaps and decisions awaiting approval.
Reject drafts that mix project versions or describe requests as instructions. Correct the source register and drafting rule before expanding the workflow.
What does it cost?
The cost depends on the agreed drafting work and supervision; see plans and pricing.


